When commercial facilities face rising demand charges and grid instability, the CICS-50SC provides 50 kWh of intelligent battery storage to cut peak costs by 30-60%. This system features Supro Energy’s advanced thermal management and modular design, enabling flexible deployment for warehouses, manufacturing plants, data centers, and mixed-use developments requiring reliable backup power and demand charge reduction.
Empower IT brings you the CICS-50SC—combining Supercapacitor battery hybrid technology with Supro’s innovative liquid cooling systems and intelligent controls for maximum safety, performance, and longevity.
The Supro Energy liquid cooling system utilizes micro-channel enhanced heat transfer technology, delivering superior thermal performance while maintaining industry maturity and strong transferability. This advanced cooling enables 100% liquid contact for superior energy efficiency compared to traditional air cooling, which typically results in PUE values of 1.4 or higher.
| Part Number | SY384V50K31R |
| Usable Energy | 50KWh |
| Cell Type | super capacitor battery |
| Rated Voltage | 384V/DC |
| Rack Minimum Voltage | 312V/DC |
| Rack Maximum Voltage | 432V/DC |
| Dimensions(WxDxH) | 750x730x1008(mm) |
| ESR/AC @1KHz | <100mΩ |
| Max. Continuous Charge Current | 100A |
| Max. Continuous Discharge Current | 100A |
| Weight | 380Kg |
| Configuration | 108S6P |
| Discharge Temperature | -20℃~+60℃ |
| Charge Temperature | 0℃~+55℃ |
| Cooling Method | Natural cooling |
| Operating Humidity | 0~90% RH Non-condensing |
| Cells Self-discharge Rate | 2% per month |
| Projected Cycle Life ( 25℃) | 20,000 times |
| Warranty | 15 years |
| Recommended Depth of Discharge | ≤ 90% |
| Maximum Depth of Discharge | 100% |
| Shell Material | Metal & ABS plastic |
| Monitoring Data | System voltage,current, temperature, SOC,SOH,cycle,cell’s voltage |
| Indicator light display | Capacity % |
| Environmental Protection | Customized |
| IP Grade | IP65 |
| Storage Conditions | -20℃~+40℃ 25% ~ 95%RH SOC>30%,one full charge needed per two months |